September 28, 2026
Reading a certificate of analysis
Lot number, test method, measured value, test date, signatory: the five fields that carry the weight.
The record is the product. These pieces cover what a certificate, a batch record or an audit trail contains, what makes it trustworthy, and how long it has to survive.
September 28, 2026
Lot number, test method, measured value, test date, signatory: the five fields that carry the weight.
August 11, 2026
A shorter run means a shorter record, and a shorter record is easier to read.
July 24, 2026
Procurement teams reject unlabeled containers more than any other defect.
July 9, 2026
A proportionate way to approve, version, issue, and retire controlled documents.
July 6, 2026
Retention periods are set by regulation, product life and contract, not by shelf space. The clock usually starts at expiry or distribution, not at creation.
July 1, 2026
Simple cross-checks for dates, units, methods, signatures, and identifiers on a certificate.
June 17, 2026
A practical distinction between two labels that are often used as if they were interchangeable.
June 5, 2026
An audit trail records who changed what, when and why. Reviewers ask for it because the final result alone cannot show how it was reached.
May 11, 2026
A lot number only means something if every container, transfer and record links back to it. Most breaks happen at the bench, not in the database.
April 27, 2026
The step-by-step account of how one batch was made, checked and released, and the document a reviewer reads before anything is approved.
April 8, 2026
Attributable, legible, contemporaneous, original, accurate: five tests a record has to pass before anyone should rely on what it says.